London - Angel -An office converted into a luxurious apartment. Open plan upstairs bathroom, wetroom downstairs and beautyfull modern kitchen.

office refurbishment in london angel
When we arrived at the scene - it looked like that...


picture 1
office refurbishment in london angel All that mess (rubbish behind the blasterborda and electrical) has been done by previous builders.


picture 2
office refurbishment in london angel They estimeted the job for 12.000, took 8.000, spent there 7 weeks and did absolutelly nothing (but the mess).
There suppose to be a kitchen...



picture 3
office refurbishment in london angel That's upstairs bathroom...if you can immagine...



picture 4
office refurbishment in london angel ...no more comments necesary...



picture 5

office refurbishment in london angel And that's a downstairs toilet.



picture 6
office refurbishment in london angel Flooring has been rmoved....and screet prepared for new tiles...

office refurbishment in london angel The whole apartment has been rewired (4.000 pounds)
Walls fixed and plastered.
(seen on pict. 1)
office refurbishment in london angel Walls has been reshaped and some features added.
(seen on pict. 5)
office refurbishment in london angel New big (60x60 cm) tiles has been fitted.
office refurbishment in london angel Upstairs - we've added (it hasn't existed before) a special room for washing machine and tumble dryier (walls, doors, plumbing and electrical)
office refurbishment in london angel A small corner WC has been fitted as well (upstairs toilet hasn't existed before...there was an open space like downstairs...
office refurbishment in london angel Oak stairs has been built to measure (designed by the owner) for the cost of 5.000 pounds.
also supporting beams has been fitted inside the walls.
office refurbishment in london angel And that's how it looked like after almost 10 weeks spent on site. Painted, decorated ... even LCD TV connected.
office refurbishment in london angel Another wiev downstairs
office refurbishment in london angel Remember picture 5 ???
office refurbishment in london angel That's the kitchen... you've seen this space on pictures 2 and 3

office refurbishment in london angel That's the widest wiev Hubert's camera could make :)
office refurbishment in london angel That's the upstairs bathroom seen on picture 4.
It took 4 weeks to make it....
Pictures on the left and at the bottom (2 of them)
office refurbishment in london angel office refurbishment in london angel
office refurbishment in london angel And this is downstairs toilet converted into a toilet/wet room.
All of the walls and the floor had to be waterproofed.
office refurbishment in london angel Happy owners Elaine and Steward and Hubert (in the middle) - our project manager.

They are happy because after 10 weeks and spending 16.000 pounds on labor only (excluding stairs and rewiring) they finally got their apartment ready to be rented (for 800 a week)


Total spent for this project was:
16000 - labor
4000 - materials (excluding kitchen units etc, bath, basins, toilets, and tiles...and stairs)

Completed in 10 weeks



Please have a look at our other projects:

1   - Epsom - Summer room and driveway
2   - Guilford - Kitchen
3   - Brixton 1 - many small jobs
4   - Harrow - Bathroom
5   - Angel 1 - Office conversion into a luxurious apartment
6   - Camden - 3 bed flat refurbishment
7   - Tulse Hill - 4 bed flat refurbishment
8   - Luton - 2 bed house fully refurbishe
9   - Angel 2 - Bathroom and other decorators jobs
10 - Brixton 2 - 2 bed flat full refurbishment
11 - Wembley - Outside toilet built