![]() |
Walls has
been knocked down. Floor had to be leveled and prepared for flooring. |
| Ale the doors
and windows has been removed |
|
![]() |
Ale the doors
and windows has been removed. |
| New doors has
been fitted. Plasterboards has been fitted everytwhere. |
|
| Windows
replaced with glass bricks |
|
| Room has been
painted (3 coats) |
|
| French doors
fitted and varnished. Fish tank stand erected using glass bricks Spotlights fitted |
|
| Roof has been
fixed. Gutters fixed as well. Extrenal doors has been prepared and painted white then. |
|
| Driveway has
been prepared for concreeting |
|
| 2 cubic
meters of concreet has been used to extend the driveway. |