![]() |
Kithen doors (right hand side) leading to the garden replaced by a window. |
![]() |
Wall between kitchen and living room
removed. That's the one with radiator hanging(kitchen). Radiator has been removed. |
![]() |
Wall between kitchen and living room
removed. That's the one with radiator hanging(living room). Radiator has been relocated. |
![]() |
Demolition in
progres. Kitchen has been cleared of everything. Arches has been removed. |
![]() |
You can see
the gap, where the wall between kitchen and living room was, and new
window. Also the spot lights fittes in kitchen-diner area. It has been done in stage 1. |
![]() |
Walls has
been plasterboarded and plastered. Old ceiling has been remplaced with plasterboards and spotlights has been fitted(in both parts of kitchen and living room - dining part) |
![]() |
Laminate
floor fitted. Plumbing done (all units has been moved to a different places). Electrical done (sockets rlocated) Walls prepared for painting |
![]() |
All unts
fitted - wiev from the hallway |
![]() |
All unts fitted - wiev from the window(sink) |
![]() |
All unts
fitted - wiev from the dining area |